Home
Next Turnkey
Previous Turnkey
Employment OpportunitiesAbout UsFabricationMarine ServicesTurnkeyEmployee LoginContact Us

Oil & Gas Facilities
Turnkey 002

Santa Fe Energy South Timbalier 179



 
  • 4 Pile Platform
  • 160' Water Depth
  • Loadout December 1997
  • No Facilities
  • 10 Week Fabrication Schedule
  • OSFI was responsible for the design and fabrication of this structure which included fabricating a new jacket, refurbishing a deck from inventory and installation
  • A 120 MMSCFD production facility was later installed, manufactured at our Ingleside, Texas facility

 
 
 
 
History
Management
Houma, LA
Ingleside, TX
Derrick Barges
Material Barges
Boats