Oil & Gas Facilities
Turnkey 007
I.P. Petroleum West Cameron 172
OSFI was responsible for the design, fabrication of production equipment, deck, jacket and installation from start to finish 13 weeks
4 Pile Platform
4 Slots
49' Water Depth
80 MMSCFD
Loadout November 1998