- OSFI was responsible for the engineering, design, procurement, fabrication and installation of this caisson production deck
- This job was installed 11 weeks after contract signing
- The deck and production facility were taken from OSFI’s stock inventory
|
|

- Caisson Production Deck
- Single Well
- 35 MMSCFD Production Facility
- 10 Week Fabrication Schedule
- Installed mid April 1999
|