- 4 Pile Platform
- 3 Slots
- 12' Water Depth
- 50 MMSCFD Production Facilities
- 12 Week Fabrication Schedule
- Loadout March 2000
- OSFI was responsible for the engineering, design, procurement, fabrication and installation of this platform
|
|
- Utilizing production facilities from OSFI’s stock inventory was instrumental in completing this project in 12 weeks
- The deck was refurbished, the jacket and piles were of new construction, all done in our Houma, Louisiana yard
- The production facilities were fabricated in our Ingleside, Texas yard
|