- Tripod Production Platform
- 205' Water Depth
- 3 Wells
- Oil Test Facility
- Fabrication Schedule 14 Weeks
|
|

OSFI was responsible for the design, procurement, fabrication and installation of this tripod platform. This deck is OSFI’s standard design, of new construction, taken out of our turnkey inventory. The jacket was of new construction.
|