- Tripod Production Platform
- 205' Water Depth
- 3 Wells
- Oil Test Facility
- Fabrication Schedule 14 Weeks
|
|

OSF was responsible for the design, procurement, fabrication and installation of this tripod platform. This deck is OSF’s standard design, of new construction, taken out of our turnkey inventory. The jacket was of new construction.
|