Oil & Gas Facilities
Turnkey 019
McMoran Oil & Gas Ship Shoal 296
Tripod Production Platform
265' Water Depth
40 MMSCFD Production Facility with I.P. Seperator & Compression
4 Wells
17 Week Fabrication Schedule
This project was awarded at the same time as the Vermillion 196 platform, these jobs were built concurrently
The platform structure was new built and the facilities were utilized from our stock inventory