Oil & Gas Facilities
Turnkey 028
Hunt Petroleum (AEC) High Island 34
Braced Caisson Production Facility
New Built Deck & Brace
40' Water Depth
50 MMSCFD Facility
10 Week Fabrication Schedule
OSFI was responsible for the design, procurement, fabrication and installation
The deck and the production facilities were OSFI’s standard design, taken out of our turnkey inventory