Turnkey 029

Hunt Petroleum (AEC) Vermilion 54




 
  • Caisson Production Deck
  • 26' Water Depth
  • 30 MMSCFD Facility
  • 8 Week Fabrication Schedule
  • OSF was responsible for the design, procurement, fabrication and installation
  • The deck and the production facilities were OSF’s standard design, taken out of our turnkey inventory

 
 
 
 