- Tripod Platform
- 2 Slots
- 40 MMSCFD Production
- 9 Week Fabrication Schedule
- 81' Water Depth
|
- OSF was responsible for the design, procurement, fabrication and installation
- The deck and the production facilities were OSF's standard design, taken out of our turnkey inventory
|