Turnkey 040

Tana Exploration Ship Shoal 145



 
  • Tripod Platform
  • 6 Slots
  • 40 MMSCFD Production
  • 10 Week Fabrication Schedule
  • OSF was responsible for the design, procurement, fabrication and installation
  • The deck and the production facilities were OSF’s standard design, taken out of our turnkey inventory

 
 
 
 