Oil & Gas Facilities
Turnkey 054
Hunt Petroleum South Timbalier 254
Tripod Production Platform
219' Water Depth
6 Slots
40 MMSCFD Production
15 Week Fabrication Schedule
OSFI removed Hunt's existing tripod at VR 248 and refurbished the deck, facility, built a new jacket, and reinstalled it at Hunt's ST 254 location